Renewable Gas Production Program

9th March 2026
EOI closed. Full application closes during July 2026 (no exact date has been released yet)

Funding to support large-scale biomethane production facilities that help decarbonise NSW industry.

The Renewable Gas Production Program provides $40 million in funding to support the development of commercially mature biomethane production facilities in New South Wales. The program aims to accelerate the supply of renewable gas that can be injected into the NSW gas network and used by industrial facilities to reduce emissions.

Biomethane offers a practical alternative to natural gas for industrial processes that are difficult to electrify, such as high-temperature manufacturing and chemical production. By supporting large-scale renewable gas projects, the program will help reduce emissions across hard-to-abate sectors while strengthening NSW’s renewable energy and fuel security.

Key Grant Details

  • Grant name: Renewable Gas Production Program
  • Total funding available: $40 million
  • Maximum funding per project: Up to $20 million
  • Co-funding requirement: Up to 50% of eligible project costs
  • Location: New South Wales
  • Project requirement: Must produce and inject biomethane into the NSW gas network by 30 June 2030
  • Minimum production capacity: 0.1 petajoules (PJ) of biomethane per year

Who is this for?

  • State: New South Wales
  • Industry sectors: Renewable energy and fuels, Waste and resource recovery, Industrial energy supply, Manufacturing and heavy industry
  • The program is designed for organisations developing or operating biomethane production facilities that can supply renewable gas into the NSW network to support industrial decarbonisation.

Eligibility

You can apply if you:

  • Have an Australian Business Number (ABN) and are an Australian entity incorporated under Australian law
  • Will own or have operational control of a biomethane production facility
  • Intend to produce biomethane in NSW using feedstock sourced within the state
  • Can supply biomethane into the NSW gas network at a minimum rate of 0.1 PJ per year
  • Can demonstrate agreements or partnerships with feedstock suppliers, gas network operators and an industrial off-taker in NSW
  • Intend to participate in GreenPower’s Renewable Gas Certification to create Renewable Gas Guarantee of Origin certificates
  • Can contribute at least 50% of eligible project costs through private investment or other funding sources

Please note that:

  • Not all projects generating certificates can receive LEIP grant funding. The Department may decide that a client can only receive one or the other, or they may reserve the right to recover revenue from the sale of certificates as a condition of the funding deed
  • Projects receiving LEIP grant funding are not eligible to claim funding for ESCs and/or PRCs under the Safeguard Accelerator Program
  • The project must reduce emissions by at least 1,000 tCO2-e per year of Scope 1 and/or Scope 2 emissions
  • Applicants must disclose revenue or cost savings from any certificates the project may generate, such as Energy Saving Certificates (ESCs) or Peak Reduction Certificates (PRCs)

What can the grant be used for?

  • Funding supports the deployment of large-scale biomethane production infrastructure and associated systems that enable renewable gas to be injected into the NSW gas network.
  • Eligible project costs may include:
    • Biomethane production facilities such as anaerobic digestion, gasification, pyrolysis or upgrading technologies
    • Feedstock handling infrastructure including collection, storage and pre-treatment systems
    • Gas upgrading and purification equipment
    • Biomethane delivery and injection infrastructure including compressors, pipelines and grid connection assets
    • Final engineering design, procurement, construction and commissioning activities required to deliver the project
  • Projects must focus on delivering commercially mature, front-of-meter biomethane production that supplies renewable gas to industrial users.
  • Northmore Gordon can support businesses developing renewable fuel and decarbonisation projects through services such as:
    • grant strategy and application development
    • feasibility studies and business cases
    • project planning and financial modelling
    • preparation of investment-ready project documentation

Timeline

Expression of Interest (EOI), which closes on 24 April 2026. Successful EOI applicants will then be invited to submit a full application. Projects must be operational and injecting gas by 30 June 2030

Apply with Northmore Gordon

The Renewable Gas Production Program represents a significant opportunity for businesses investing in renewable fuel production and industrial decarbonisation projects.

Northmore Gordon works with organisations across Australia to identify suitable grants, develop competitive applications, and manage the entire funding process from project concept through to submission.

If you are planning a biomethane production project or renewable fuel facility, our team can help you assess eligibility and prepare a strong application.

Speak with Northmore Gordon today to start your application.

Contact An Expert

Grant Raja

Senior Business Development Manager

Grant Raja is a Principal Consultant in Sales and Key Account Management at Northmore Gordon, bringing more than 30 years…

Read MoreContact Grant

Unlock funding for energy and carbon projects today!

We help identify suitable projects for the grant, manage the application process, implement the projects and deliver. Get in touch today about your next project.

How to get involved

Expressions of interest are now open for eligible businesses.

Please fill out the form below if you are interested in a metering and monitoring assessment and we will be in touch