Live AU Certificate Prices Twitter Linkedin-in Youtube Buy and Sell Global RECs Contact

Manufacturing

Solar irrigation upgrades: Don’t let certificate funding go unclaimed 

Read More

How to avoid costly energy project mistakes in manufacturing.

Read More

Visy Gibson Island: 34,000 t CO2‑e Cut a Year With Waste‑to‑Energy

Read More

MainStream Aquaculture: $19K Grant funds a heat pump electrification project

Read More

Poultry Client Set to Hit 2030 & 2050 Carbon Emissions Targets

Read More

Greenham: Moving Towards Decarbonisation

Read More

AJ Bush & Sons: 10MW Boiler Upgrade Funded by Energy Savings Certificates

Read More

Frew Foods: 10,183 VEECs from a biomass boiler upgrade chops energy costs

Read More

Bulla Dairy Food‘s boost efficiency and reduces waste.

Read More

Get in touch

Australia

1300 854 561 (Advisory)

1300 878 500 (Certificates)

Melbourne

Suite 1, Level 4

607 Bourke Street

Melbourne

VIC 3000

Singapore

+65 6690 2480



Singapore

1 Keong Saik Road,

Singapore 089109

Stay up to date

mailto:%20info@northmoregordon.com https://twitter.com/northmoregordon https://www.linkedin.com/company/northmore-gordon-pty-ltd https://www.youtube.com/channel/UCdGc6mABpL2XxVUCrVjYQ1g

Alternatively, complete the form and we will be in

touch with you.

https://northmoregordon.com
Services
Sectors
Upgrades
Certificates
Government Schemes
Helpful Links

Skip to content

What is the 'Manufacturing' tag page on Northmore Gordon's website about?

It is an archive page on the Northmore Gordon website (northmoregordon.com) that collects articles and case studies tagged 'Manufacturing,' covering topics like solar irrigation upgrades, energy project mistakes, waste-to-energy, heat pump electrification, carbon emissions targets, decarbonisation, boiler upgrades, and biomass boiler upgrades.

What case study describes a 34,000 t CO2-e per year reduction using waste-to-energy?

The case study 'Visy Gibson Island: 34,000 t CO2‑e Cut a Year With Waste‑to‑Energy,' published October 8, 2025, describes industrial biomass waste-to-energy innovation at scale.

Which case study involves a $19K grant for a heat pump electrification project?

'MainStream Aquaculture: $19K Grant funds a heat pump electrification project,' published August 15, 2025, describes how MainStream Aquaculture used a grant to fund an electric heat pump project to reduce energy bills.

What case study discusses a poultry client's carbon emissions targets?

'Poultry Client Set to Hit 2030 & 2050 Carbon Emissions Targets,' published May 20, 2025, covers a poultry industry client positioned to meet its 2030 and 2050 carbon emissions targets.

What upgrade is described in the AJ Bush & Sons case study?

The case study 'AJ Bush & Sons: 10MW Boiler Upgrade Funded by Energy Savings Certificates,' published May 20, 2025, describes how a 10MW boiler upgrade at AJ Bush & Sons was funded using Energy Savings Certificates.

How many VEECs did Frew Foods generate from its biomass boiler upgrade?

According to the case study 'Frew Foods: 10,183 VEECs from a biomass boiler upgrade chops energy costs' (published May 13, 2025), Frew Foods generated 10,183 VEECs (Victorian Energy Efficiency Certificates) from its biomass boiler upgrade.

What does the Bulla Dairy Foods case study cover?

'Bulla Dairy Food's boost efficiency and reduces waste,' published May 13, 2025, is a data case study report on metering and monitoring that discusses how Bulla Dairy Foods improved efficiency and reduced waste.

According to Northmore Gordon's knowledge base, what is the first step manufacturers should take to optimize energy performance?

The first step is to build an 'operating map' that describes major production lines, utility systems, and shifts, identifying shared services like compressed air, steam, cooling, and ventilation, and matching these systems to available meters and production records.

What are the key investigation areas suggested for diagnosing manufacturing energy problems?

Suggested diagnostic areas include: high consumption outside production hours (checking operating schedules, idle systems, and control logic), unexplained air-system load (assessing demand, pressure, leakage, and compressor sequencing), heating equipment nearing replacement (evaluating heat duty, fuel alternatives, and heat recovery), performance differences between production lines, and inability to compare investment cases due to inconsistent assumptions.

What contact numbers does Northmore Gordon provide for Australia?

Northmore Gordon lists 1300 854 561 for Advisory and 1300 878 500 for Certificates, with its Melbourne office at Suite 1, Level 4, 607 Bourke Street, Melbourne, VIC 3000.

Images on This Page