Measurement and verification: the next wave of rewarded energy savings
Archive context: This page summarises a Northmore Gordon article from 20 January 2021. Scheme settings, incentive values and project outcomes described there may have changed.
Measurement and verification (M&V) compares a project's measured energy use with an adjusted baseline. The original article describes establishing an energy-use model, recording relevant operating variables and measuring post-upgrade performance. Under eligible project-based methods, verified savings can support energy-efficiency certificate claims and help offset upgrade costs.
How a project is assessed
Define the site or equipment boundary and collect suitable baseline meter data.
Model normal operating conditions, including production and weather where relevant.
Document the upgrade, then meter post-installation performance.
Adjust the baseline for changed conditions and calculate savings under the applicable scheme method.
Examples from the 2021 article
The article reports an M&V project for Van Wyk Flowers that replaced gas boilers with a biomass heating system and claimed Victorian Energy Upgrades incentives. It also describes 5G Networks data-centre upgrades, a Molycop electric-arc-furnace project and Metro Trains Melbourne lighting work. The reported savings and incentives belong to those specific projects and historical scheme rules.
Project design, metering and claim timing should be checked against the current scheme and approved method before work starts.
Source: Northmore Gordon, 20 January 2021. The source credits an earlier Ecogeneration publication.
What is measurement and verification (M&V) as described in Northmore Gordon's 2021 archive article?
Measurement and verification (M&V) compares a project's measured energy use with an adjusted baseline. It involves establishing an energy-use model, recording relevant operating variables, and measuring post-upgrade performance. Under eligible project-based methods, verified savings can support energy-efficiency certificate claims and help offset upgrade costs.
What steps are involved in assessing an M&V project according to the article?
The steps are: define the site or equipment boundary and collect suitable baseline meter data; model normal operating conditions, including production and weather where relevant; document the upgrade, then meter post-installation performance; and adjust the baseline for changed conditions and calculate savings under the applicable scheme method.
Which projects are cited as examples in the 2021 Northmore Gordon article on measurement and verification?
The article cites an M&V project for Van Wyk Flowers that replaced gas boilers with a biomass heating system and claimed Victorian Energy Upgrades incentives, 5G Networks data-centre upgrades, a Molycop electric-arc-furnace project, and Metro Trains Melbourne lighting work.
What incentive scheme did the Van Wyk Flowers project claim under, according to the article?
The Van Wyk Flowers project, which replaced gas boilers with a biomass heating system, claimed incentives under the Victorian Energy Upgrades scheme.
Do the reported savings and incentives in the 2021 article still apply today?
No. The page notes this is an archive page, and the reported savings and incentives belong to those specific projects and historical scheme rules. It advises that project design, metering and claim timing should be checked against the current scheme and approved method before work starts, since scheme settings, incentive values and project outcomes described in the original article may have changed.
When was the original Northmore Gordon article on measurement and verification published, and where can it be found?
The original article was published on 20 January 2021 and is sourced from Northmore Gordon, with the source crediting an earlier Ecogeneration publication. It can be found at https://northmoregordon.com/articles/measurement-and-verification-the-next-wave-of-rewarded-energy-savings/.