BESS5: Large commercial and industrial battery storage
BESS5 is the NSW Peak Demand Reduction Scheme activity for eligible business batteries with more than 200 kWh and up to 30,000 kWh (30 MWh) usable capacity. Residential buildings and data centres are excluded. Eligible implementations may create Peak Reduction Certificates (PRCs).
Reviewed 23 November 2026. This guidance uses the PDRS Rule effective 12 October 2026 and PDRS Method Guide V3.2, issued 15 October 2026. The rule and applicable transition provisions govern eligibility; match the project’s implementation date to the relevant version.
What must the project meet?
The permitted battery size and the calculation capacity are different. Calculation capacity is the lowest of usable capacity, 10,000 kWh and four hours multiplied by inverter output. A 30 MWh battery therefore does not receive a calculation based on all 30 MWh. Other activity and network factors still apply to the final certificate quantity.
Check the specific UL 9540A testing requirement, the usable-capacity-to-inverter-output limit, internet connectivity and demand-response control capability, behind-the-meter arrangement, licensed installation and planning and network approvals. BESS5 has its own equipment requirements; do not substitute the BESS3 or BESS4 checklist. A site with a previous BESS4 or BESS5 implementation does not meet the no-previous-implementation requirement.
Where new solar is part of the selected activity configuration, its capacity and commissioning date can affect eligibility and calculation. Review the relevant 90-day provisions and funding interactions before finalising the design. PRCs do not automatically establish an entitlement to LGCs, REGOs or another certificate stream.
Prepare the evidence before installation
For a large industrial project, bring the single-line configuration, usable and nominal capacity, inverter output, site classification, fire-safety and testing documents, network and planning approvals, solar details, commissioning programme, previous claims and operating constraints. Establish who owns the relevant certificate rights and who will retain commissioning and control-capability evidence.
How Northmore Gordon can help
We work with asset owners, installers and developers to connect the certificate opportunity with the technical and commercial case. We can help screen the activity, review calculation assumptions, organise evidence and support the certificate process. Engage us before selecting equipment so the design and documentation can be assessed together.
Model tariff shifting, demand-charge savings and resilience separately from certificate proceeds. Check whether one operating plan can deliver the combined benefits, and keep a case without unconfirmed incentive value in the investment comparison.
Current documents and related guidance
Read the official PDRS PDF library, compare BESS3, BESS4 and BESS5 or use the battery calculator for an initial estimate. The calculator does not establish eligibility.
Talk to Northmore Gordon about your project. Start with the site, project stage, proposed capacity and decision date; available evidence is more useful than an unverified incentive estimate.