Creating a gas measurement and monitoring plan for your industrial site

Share this article

Gas costs are hurting business and have been for some time. Making informed and smart decisions using good data can help reduce operating costs. The measurement and monitoring of energy flows such as gas, steam, hot water, hot air or electricity is needed, however it can be technically challenging and often expensive.

For these reasons, a well-thought-out measurement and monitoring plan is an essential part of any industrial site, and can be achieved using a 5-step process:

Step 1 – Specify the goal and understand what is already known.

Step 2 – Prioritise what to measure.

Step 3 – Investigate and select energy management software and long term data storage

solution.

Step 4 – Specify and select suitable meters and their communication system.

Step 5 – Develop a budget and implementation plan

Step 1 – Specify the goal and understand what is already known.

This is the essential part of a metering and monitoring upgrade as it determines the useful data and how it will be used. Other equally valid goals could be:

Once the objective is clear, spend time determining what data is available and what additional metering is necessary. In many cases some metering is already in place but unused.

Step 2 – Prioritise what to measure.

Keeping in mind the initial goal, determine the highest priority energy flows that need to be measured. Start by building a preliminary energy balance on either the site, a specific utility, a plant area or an individual piece of equipment. It isn’t necessarily the largest energy users that are the priority.

Step 3 – Investigate and select energy management software and long term data storage solution

Before jumping in to select meters, consider how to collect and store the data, as well as who needs the information. The purpose of metering is to provide data that is usable, and insights are acted upon. Data collection may use a pre-existing data management or SCADA system, or a new online portal.

The range of people needing to access the data might range from plant operators, plant managers, energy managers, or compliance personnel.

Step 4 – Specify and select suitable meters and their communication system.

There are hundreds of different meters available on the market, and all of them have different benefits and drawbacks. Consider things like precision, repeatability, flow range, method of installation and format of the data being reported.

Step 5 – Develop a budget and implementation plan.

The budget and implementation plan of the metering and monitoring project must consider:

Meter validation is often overlooked. To test if the meter is accurate, first compare its data with what is expected, or with other meters up or downstream. At Northmore Gordon we often find meters in the field that have been incorrectly reporting energy usage for years!

Make informed and smart decisions about energy usage.

Acting on the data is what really matters. Software tools exist that are designed to aggregate data from industrial data management systems and present it in a way that is easy to understand. If information is easy to understand, it is more likely to be trusted and acted upon.

Northmore Gordon is passionate about helping large industrial and commercial customers increase energy productivity. We can help you design a metering, monitoring and energy management solution for your specific needs.

For more specific details on gas metering and monitoring, you might want to check out the NSW OEH publication co-authored by Northmore Gordon: “Gas Measurement and Monitoring Guide” or contact me.

Alex Holdsworth

Consultant, Northmore Gordon

a.holdsworth@northmoregordon.com

You may also like:
Welcome to our August & September 2026 Compliance Update.
Australian Certificate Markets – August 2026 Update 
Where’s the value in renewable heat?

Latest Updates

Webinar – Buying renewable certificates across Asia-Pacific under SBTi and RE100

What we’ll cover Webinar details: Wednesday 11 November 2026, 1:00pm AEDT10:00am Perth, Singapore, Malaysia and Taiwan9:00am Vietnam11:00am Korea3:00pm New Zealand2:00am London (Wednesday 11 November)9:00pm New

Read More »

Australian Certificate Markets – September 2026 Update

Price Summary  Certificate  Open  Close  Range  Effective cap  Movement / Reason  PRC  $3.35  $3.40  $3.35 – $3.40  $3.80  ▲ Held August’s gains  ESC  $29.00  $29.65 

Read More »

Northmore Gordon accredited as a GreenPower Renewable Gas Trader

Northmore Gordon is now accredited under the GreenPower Renewable Gas Certification to trade Renewable Gas Guarantee of Origin Certificates (RGGOs).  This means we can buy

Read More »

STC threshold set to rise from 100kW to 1MW

The Clean Energy RegulatorThe Clean Energy Regulator is the Australia Government body responsible for accelerating carbon abatement for Australia through the administration of the National

Read More »

ASRS Group 3: are you in scope and don’t know it?

Correct as at 13 September 2026.  If your company is a large proprietary company, you may be legally required to report under Australia’s mandatory climate

Read More »

Beyond annual matching: The evolution of time-stamped RECs

For more than a decade, Renewable Energy Certificates (RECsI-RECs, GOs, TIGRsTradeable Instrument for Global Renewables (TIGR) Registry is an online platform for tracking and transferring renewable energy certificates (RECS), enabling developers to generate,verify and sell RECs. The registry is run by APX, a US company that provides infrastructure for environmental markets around the world., LGCs, ZNECs, J-Credits) have underpinned global renewable electricity procurement. By purchasing RECs equivalent to

Read More »

Get in touch

Australia

1300 854 561 (Advisory)

1300 878 500 (Certificates)

Melbourne

Suite 1, Level 4

607 Bourke Street

Melbourne

VIC 3000

Singapore

+65 6690 2480



Singapore

1 Keong Saik Road,

Singapore 089109

Stay up to date

mailto:%20info@northmoregordon.com https://twitter.com/northmoregordon https://www.linkedin.com/company/northmore-gordon-pty-ltd https://www.youtube.com/channel/UCdGc6mABpL2XxVUCrVjYQ1g

Alternatively, complete the form and we will be in

touch with you.

https://northmoregordon.com
Services
Sectors
Upgrades
Certificates
Government Schemes
Helpful Links

Skip to content

What is the 5-step process for creating a gas measurement and monitoring plan for an industrial site?

According to Northmore Gordon, the 5-step process is: Step 1 – Specify the goal and understand what is already known; Step 2 – Prioritise what to measure; Step 3 – Investigate and select energy management software and a long-term data storage solution; Step 4 – Specify and select suitable meters and their communication system; and Step 5 – Develop a budget and implementation plan.

Why is specifying the goal the essential first step in a gas measurement and monitoring plan?

Specifying the goal determines what data will be useful and how it will be used. Example goals include determining the Coefficient of Performance (COP) of a refrigeration system to support a replacement business case, understanding how much one area of a plant costs to run, or establishing and tracking plant energy performance KPIs. Once the objective is clear, time should be spent determining what data is already available and what additional metering is needed, since some metering is often already in place but unused.

How should a company prioritise what gas flows to measure?

Keeping the initial goal in mind, the highest priority energy flows should be determined by building a preliminary energy balance on either the site, a specific utility, a plant area, or an individual piece of equipment. The article notes that it isn't necessarily the largest energy users that are the priority.

What should be considered before selecting meters for a gas monitoring project?

Before selecting meters, a company should consider how data will be collected and stored and who needs the information, since the purpose of metering is to provide usable data that leads to acted-upon insights. Data collection may use a pre-existing data management or SCADA system, or a new online portal, and the people needing access can range from plant operators and plant managers to energy managers or compliance personnel.

What factors should be considered when selecting suitable gas meters and communication systems?

The article states there are hundreds of different meters available on the market, each with different benefits and drawbacks. Factors to consider include precision, repeatability, flow range, method of installation, and the format of the data being reported.

What should a budget and implementation plan for a metering project include?

A budget and implementation plan must consider the schedule of works to be completed, plant downtime and commissioning requirements, communication and data storage installation, safety of the works carried out, new procedures or responsibilities to utilise the data, and meter validation and ongoing meter maintenance.

Why is meter validation important, and how is it performed?

Meter validation is often overlooked but is important because Northmore Gordon frequently finds meters in the field that have been incorrectly reporting energy usage for years. To test if a meter is accurate, its data should first be compared with what is expected, or with other meters located upstream or downstream.

What role does software play in making gas usage data useful?

Software tools exist that aggregate data from industrial data management systems and present it in an easy-to-understand way. According to the article, if information is easy to understand, it is more likely to be trusted and acted upon, and acting on the data is what really matters.

Who wrote this article and what is their background?

The article credits Alex Holdsworth, Consultant at Northmore Gordon (a.holdsworth@northmoregordon.com), though it is attributed to Northmore Gordon and published July 9, 2019. Northmore Gordon is described as an Energy Efficiency Consultancy Company.

What publication is referenced for more detailed guidance on gas metering and monitoring?

The article references the NSW OEH publication co-authored by Northmore Gordon titled 'Gas Measurement and Monitoring Guide' for more specific details on gas metering and monitoring.

What data responsibilities should be established before installing gas metering equipment?

According to supporting knowledge-base context, before installation begins, a plan should establish clear data responsibilities including: data ownership (who owns the gas measurement data and who can access it), data export (how data will be extracted and in what formats), and equipment changes (how changes to metering equipment will be recorded and documented).

What key questions should a gas measurement plan be designed to answer?

Per supporting knowledge-base context, a measurement plan should address questions such as: whether gas consumption can be attributed to the relevant equipment boundary (to account for unexplained consumption), whether the recording interval is fine enough to capture peak demand events, whether the dataset covers representative pre- and post-project conditions (to assess if an upgrade improved performance), whether production, occupancy, or other operating variables are available (to explain performance changes), and whether timestamps, units, corrections, and source records are retained (so calculations can be reproduced by another reviewer).

Images on This Page